Key Features

  • Be able to track the data record of the flow test under stable state.

  • The production flow test includes production test and injection test. Meanwhile the measurement under stable state of a multi-rate test can be record.

  • The production flow test data have the validation for production allocation.

  • The allocation factors of different product for wellbore or well completion can be tracked and versioned by date.